Sinclair-Construction-Werner

Werner Enterprises

Project Description

Project: Werner Expansion
Contractor: Mendick Contracting, Inc.
Owner: Werner Enterprises
Location: Villa Rica GA

The project comprised of a (4) acre expansion of the Werner Trucking terminal located in Villa Rica, Georgia. The new expansion allows for onsite driver training and additional trailer parking.

Sinclair Construction Group performed a concrete package including 8″ of mass concrete paving with laser fine grading of subgrade, laser screeding, place and finish, saw cutting and curing. A training building addition was also completed which included spread footings, turndown edges, slab on grade and slab on metal deck along with steps and cheek wall work.

Sinclair-Construction-Site-Redevelopment-Mass-Concrete-Paving-(1)
Sinclair-Construction-Site-Redevelopment-Mass-Concrete-Paving-(2)
ODFL photo with logo for main page Sinclair 2

Old Dominion Freight Lines

ODFL Sinclair Construction Concrete Slab on Grade Logistic Concrete Project (7)

Project Description

Project:  Old Dominion Freight Lines Renovation
Contractor:  D.F. Chase
Owner:  Old Dominion Freight Lines
Location:  Greensboro, NC

Due to tremendous growth, Old Dominion Freight Lines required an office expansion, miscellaneous pourbacks, bollards and stairs/ramps. We worked closely with our client to provide the necessary retrofit work along with the foundations for the office expansion.

Sinclair Construction Group performed a turn-key concrete package including select demolition/coring and haul off, interior trench work, slab on grade, spread and continuous footings, place and finish, saw cutting and pit infill work. Line and boom pumps were utilized. Additional site work including concrete steps, a cast in place wall and bollards were also installed.

Sinclair-Construction-Averitt-Express-SOG-Slabs-Walls-Demo-Site-ReDevelopment-(5)

Averitt Express Dock Expansion

Sinclair Construction Averitt Express SOG Slabs Walls Demo Site ReDevelopment (5)
Sinclair Construction Averitt Express SOG Slabs Walls Demo Site ReDevelopment (2)

Project Description

Project:  Averitt Express Loading Dock Expansion
Contractor:  D.F. Chase
Owner:  Averitt Express, Inc.
Location:  Atlanta, GA

Addition of approximately 50,000 SF of concrete paving and incorporation of 44 new bay doors to the existing terminal located off Fulton Industrial Blvd. Sinclair provided turnkey concrete foundations and flatwork services for the duration of the project working closely with the Contractor on all aspects of the construction and development of the site.

Our turnkey approach included saw cutting, demolition, and disposal of existing asphalt and concrete paving for building pad and new concrete paving. Sinclair Construction exported approximately 200 loads and imported approximately 350 loads or 3,500 CY of fill dirt for placement and compaction behind loading dock walls for the loading dock slab on grade.

Our services also included erosion control, layout, shallow excavation, footings, cast in place walls, piers, backfilling of walls, subgrade installation and compaction, slab on grade and concrete paving. The place and finish portion of the work totaled about ~26,000 SF of 8” wire reinforced concrete paving and ~20,000 SF of 6” fiber reinforced slabs for the new loading dock.

The concrete slab on grade on the dock level incorporated the use of Forta-Ferro fibers into the concrete mix design at a rate of 3 lbs/CY to control cracking and add long term durability. Since FORTA’s beginning in 1978, its fibers have played an important role in the design and construction of many different types of projects.

Sinclair Construction Turnkey Concrete Slabs Walls Foundations Averitt Express (8) test 3a

Averitt Express Campus Expansion

Sinclair Construction Turnkey Concrete Slabs Walls Foundations Averitt Express (8) test 3a
DCIM100MEDIADJI_0119.JPG

Project Description

Project:  Averitt Express Campus Expansion
Contractor:  D.F. Chase
Owner:  Averitt Express, Inc.
Location:  Lawrenceville, GA

This project consisted of an expansion to the existing loading dock/apron and maintenance shop, and dolly pads for site trailer parking totaling approximately 85,000 SF.

Sinclair provided turnkey concrete foundations and flatwork services for the duration of the project working closely with the Contractor and the Owner on all aspects of the construction and development of the site.

Our turnkey approach included saw cutting/select demolition, shallow foundations and CIP walls, slabs on grade and concrete paving.

The concrete slabs on grade and concrete paving included the use of Forta-Ferro macro fibers into the concrete mix design at a rate of 3 lbs per CY to control cracking and add long term durability. Since FORTA’s beginning in 1978, its fibers have played an important role in the design and construction of many different types of projects.