Project Summary & Highlights

Project Summary .

A 7″ MEGASLAB® with no rebar replaced an ordinary 8-1/2″ slab with (2) layers of rebar. One joint in 35,000 SF. Although the elevated slabs were designed to be reinforced by rebar, none of it was needed.

Industry

Industrial

Square Feet

105276

Location

Atlanta, GA

Owner/Client

SAFStor

Project Photo Gallery

About this project

Project Details .

A 7″ MEGASLAB® with no rebar replaced an ordinary 8-1/2″ slab with (2) layers of rebar. One joint in 35,000 SF. Although the elevated slabs were designed to be reinforced by rebar, none of it was needed.